Flushing work using pigs

The largest pre-commissioning flushing works in our past record are:
・ The largest pipe diameter 56B (1,400mm)
・ The longest pipeline section in Japan (34km)
・ Our work includes introduction and removal of liquid for hydrostatic tests, pipeline drying and dew point control
・ GPS/ Pig locator systems
Pre-commissioning flushing
Pipe buckling testing using a gauging pig
A pig tracking transmitter installed
Dew point control using poly pigs inside the pipeline